Rust Server Now
46,849 playing Find a server
Offlinechecked 1d ago · scouted since 13 Sep 2026

MS Project | SOLO/DUO

Modded carbon
Join server
Evaluation 27 Bronze #14,958 on player hours
Players now
0/25
0% full
7-day average
0
peak –
Rank
#14,958
top 69%
Wiped
4d 15h
ago · 19 Nov, 21:05 UTC
Next wipe
9d 6h
Thu 3 Dec, 19:00 UTC
Team limit
8
no published schedule

Evaluation

six readings of the figures on this page, 0 to 100 each
Population0Standing31Uptime2Performance100Wipe hold0Momentum–
Population0 of 25 on average 0
Standing#14,958 on player hours 31
Uptime1 of the last 48 hours 2
Performance240 server fps on average 100
Wipe hold0% of wipes kept half their crowd 0
Momentumno rank a week ago –

The score is the average of the readings that have figures. Population is the seven-day average against the slots; standing is how near the top of the rank it is; uptime the hours of the last 48 on the list; performance its server fps, 60 or more counting as full; wipe hold the share of its recent wipes that kept half their crowd; momentum its rank against a week ago, 50 for no change. The tier is the rank alone: Titanium is the top 10, Master the top 50, Diamond 150, Platinum 400, Gold 1,000, Silver 2,500.

Population

No hourly history yet.

Hourly average and peak, UTC.

Wipe record

6 on record
Next wipe
Thursday 3 December19:00 UTC · in 9d 6h

The force wipe · high confidence

usual gap
35 days
between real wipes
on rhythm
75%
of its recent wipes
wipe-day peak
0
players, last three wipes
crowd held
0%
else halves by day 1

The first 48 hours of its last wipes

Thu 19 NovThu 15 OctSat 26 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h
DateTimePeakLasted
19 Nov Thu 21:05 0 running
5 Nov FW Thu 19:00 – –
15 Oct Thu 20:05 0 35 days
1 Oct FW Thu 18:00 – –
26 Sep Sat 09:07 1 19.5 days
17 Sep Thu 20:03 1 8.5 days

Performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: a point a day, measured since 17 Sep. Low fps and a climbing entity count mean lag.

Rank history

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep30 Sep9 Oct24 Oct2 Nov23 Nov

Top 69% of all ranked servers. Ranked on player hours over the last seven days.

Intel

Map of MS Project | SOLO/DUO
Map
Procedural Map
Size
3500
Seed
245774532
Open on RustMaps
Address
80.221.91.195:28015
Region
–
Max players
25
Group limit
8, the default
Wipe schedule
–
Last wipe
19 Nov 2026, 21:05 UTC
Hostname
–
First seen
13 Sep 2026
In its own words
DUO PvP | No Base Raiding | Raidable Bases Max team size: 2 players Player bases cannot be raided Raid custom Raidable Bases only Keep a 6-slot backpack after death Fair PvP without offline raiding Build. Explore. Fight. Your home is always safe.

Server tags

what each tag it publishes means · mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y
GamegmrustGame mode Survival in the standard Rust format.
mp25Max players Capacity: 25.
ts8Group limit The default applies: 8 to a team.
v2633Protocol Game protocol 2633 - same version required to connect.
cs162929Build Build 162929.
ptrakNetworking RakNet handles the network layer here, as standard for the game.
$r?Region code No region set.
Mods and access^zModded Modded listing: plugins or settings make the difference.
^yCarbon This server uses Carbon for plugins.

Flag meanings are Facepunch's.

Similar servers

the same kind of game, then region, group limit, rate and wipes
  1. 1
    РУССКИЙ ДЛЯ НОВИЧКОВ | WIPE 24.11EU · groups of 8+ · weekly · 162 on average
    Unranked
    148/300
  2. 2
    МИНИ-КАРТА 2Х | STORM | FPS+ 21.11EU · groups of 8+ · weekly · 128 on average
    Unranked
    133/100
  3. 3
    ShockRust | Blue | NoLimitno group limit · 106 on average
    Unranked
    126/400
  4. 4
    404 RUST 2Х|ДЛЯ НОВИЧКОВ|СИБИРСКИЙ 17.11EU · groups of 16+ · monthly · 80 on average
    Unranked
    18/700
  5. 5
    404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 21.11EU · groups of 16+ · monthly · 62 on average
    Unranked
    32/1000
  6. 6
    ShockRust | Green | MAX 4no group limit · 61 on average
    Unranked
    49/250

Briefing

quick answers, from the figures on this page
Population
01What is the rank position of MS Project | SOLO/DUO?

The rank for MS Project | SOLO/DUO is #14,958 on seven-day player hours, in the top 69% of ranked servers.

02Current population on MS Project | SOLO/DUO: how busy is it?

Right now MS Project | SOLO/DUO is not online; its last appearance was 46 hours ago. The average population for the last seven days is 0.

Server Info
03What Rust version is MS Project | SOLO/DUO on?

Version for MS Project | SOLO/DUO: Rust network protocol 2633 and build 162929 on Linux. To join, your game must share the protocol; Steam takes care of updating it.

04Is the performance on MS Project | SOLO/DUO good?

Server fps over the last 48 hours: 240 average, 240 lowest. Entities peaked at 72,288, including buildings, deployables and all other world objects. Memory usage reached 1,944 MB at its highest. Players feel lag when fps drops and entities climb.

05Location of MS Project | SOLO/DUO: where?

No region is published by MS Project | SOLO/DUO. What Rust Server Now shows is a server's stated location, not where its machine is actually located. For this server, the address is 80.221.91.195:28015.

06How reliable is MS Project | SOLO/DUO, and is it online?

Live status: MS Project | SOLO/DUO is down; last seen 46 hours ago. The last restart happened around 2 hours ago, according to uptime. It was up 39% of the time over the last 7 full days: 65 of 168 hours. 13 September 2026 is when Rust Server Now first saw it.

Lists & Tags
07The tags on MS Project | SOLO/DUO: what do they mean?

For the in-game browser, MS Project | SOLO/DUO declares the following tags: gmrust (Game mode): Survival in the standard Rust format; mp25 (Max players): Capacity: 25; ts8 (Group limit): The default applies: 8 to a team; v2633 (Protocol): Game protocol 2633 - same version required to connect; cs162929 (Build): Build 162929; ptrak (Networking): RakNet handles the network layer here, as standard for the game; $r? (Region code): No region set; ^z (Modded): Modded listing: plugins or settings make the difference; ^y (Carbon): This server uses Carbon for plugins. Its queue, its current player count and the world's creation time sit in the tags as well, shown at the top of this page.

08Where does MS Project | SOLO/DUO show up in Rust Server Now lists and filters?

These Rust Server Now lists include MS Project | SOLO/DUO: Modded Rust servers. It appears on the server list when you apply these filters: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last week.

Wipe Schedule
09On what timetable does MS Project | SOLO/DUO wipe?

The wipe rhythm for MS Project | SOLO/DUO is every 5 weeks on Thursday at 21:05 UTC. Every Rust server wipes at the force wipe on Thursday 3 December at 19:00 UTC, which is its next wipe. 4 days 15 hours have passed since its current world began.

10On wipe day, what changes for MS Project | SOLO/DUO?

On average, 0 players was the busiest its recent wipes got. The latest wipe saw its peak 0 hours in. Half that peak was held until the next wipe in 0% of its recent wipes. If not, it dropped below half by day 1.

Server Rules
11The map for MS Project | SOLO/DUO: which one?

For MS Project | SOLO/DUO, the map is procedural at size 3,500 with seed 245774532, generated by the game. You can look at the map on RustMaps from this page: identical size and seed reproduce it.

12The rules and settings of MS Project | SOLO/DUO: what are they?

You will not find a gather rate in the name MS Project | SOLO/DUO. 8 players per group is the default and the limit here. survival is the game mode, normal Rust: gather, build, raid. PvP and raiding are enabled. The server browser lists it as Modded: plugins or settings change the game. You will find Carbon plugins running here. VAC, Valve's anti-cheat, is enabled.

Join Info
13To join MS Project | SOLO/DUO, what must you do?

In Rust, press F1 and run client.connect 80.221.91.195:28015; or use Launch Rust on this page to connect through Steam.